3V0-41.19 Exam Questions & Answers

Exam Code: 3V0-41.19

Exam Name: Advanced Design NSX-T Data Center 2.4

Updated: Nov 09, 2024

Q&As: 50

At Passcerty.com, we pride ourselves on the comprehensive nature of our 3V0-41.19 exam dumps, designed meticulously to encompass all key topics and nuances you might encounter during the real examination. Regular updates are a cornerstone of our service, ensuring that our dedicated users always have their hands on the most recent and relevant Q&A dumps. Behind every meticulously curated question and answer lies the hard work of our seasoned team of experts, who bring years of experience and knowledge into crafting these premium materials. And while we are invested in offering top-notch content, we also believe in empowering our community. As a token of our commitment to your success, we're delighted to offer a substantial portion of our resources for free practice. We invite you to make the most of the following content, and wish you every success in your endeavors.


Download Free VMware 3V0-41.19 Demo

Experience Passcerty.com exam material in PDF version.
Simply submit your e-mail address below to get started with our PDF real exam demo of your VMware 3V0-41.19 exam.

Instant download
Latest update demo according to real exam

*Email Address

* Our demo shows only a few questions from your selected exam for evaluating purposes

Free VMware 3V0-41.19 Dumps

Practice These Free Questions and Answers to Pass the VCAP-NV Design 2020 Exam

Questions 1

Which is associated with the Discover Task of the Engagement Lifecycle?

A. Create and document the logical and virtual design.

B. Gather and document requirements, assumptions and constraints.

C. Build, deploy, implement and test the design.

D. Measure performance against customer's requirements.

Show Answer
Questions 2

An architect is helping an organization with the Physical Design of an NSX-T Data Center solution. This information was gathered during the Assessment Phase:

1.

There Is a critical application used by the Finance Team.

2.

The critical application has an availability and recoverability SLA of 99.99%.

3.

The critical application Is sensitive to network changes.

Which two should an architect include in their design? (Choose two.)

A. Install and configure hosts with 100Gbps physical NICs.

B. Configure Tler-0 gateway for eBGP and ECMP.

C. Configure Tier-1 gateway for eBGP and ECMP.

D. Enable BFD on Tier-0 gateway.

E. Configure multiple static routes on Tier-1 gateway.

Show Answer
Questions 3

An architect is helping an organization with the Logical Design of an NSX-T Data Center solution. This information was gathered during the Assessment Phase:

1.

Customer currently has a single 10 host vSphere cluster.

2.

Customer wants to improve network security and automation.

3.

Current cluster utilization and business policies prevent changing the existing vSphere deployment.

4.

High-availability is important to the customer.

Which three should the architect include in their design? (Choose three.)

A. Apply vSphere Distributed Resource Scheduler (vSphere DRS) VM-Host anti-affinity rules to NSX Managers.

B. Deploy at least two large-size NSX-T Edge virtual machines in the vSphere cluster.

C. Apply vSphere DRS VM-Host anti-affinity rules to the virtual machines of the NSX-T Edge cluster.

D. Remove 2 hosts from the cluster and create a new edge cluster.

E. Apply vSphere DRS VM-Host affinity rules to the NSX-T Controller VMs.

F. Deploy the NSX Controllers in the management cluster.

Show Answer
Questions 4

An architect is helping an organization with the Logical Design of a Layer 2 bridging solution. This information was gathered during the Assessment Phase:

1.

Workloads are running on ESXI hosts.

2.

Workloads are running on KVM hosts.

3.

Workloads on both type of hypervisors should use bridging services.

4.

VLAN 50 is used for Tier-0 uplink connectivity.

Which should the architect include in their design?

A. Create an NSX Edge Bridge Cluster and configure the bridging profile with VLAN 60.

B. Create an ESXi Bridge Cluster and configure the bridging profile with VLAN 60.

C. Create an NSX Edge Bridge Cluster and configure the bridging profile with VLAN 50.

D. Create an ESXi Bridge Cluster and configure the bridging profile with VLAN 50.

Show Answer
Questions 5

An architect is designing a solution for containerization. The solution will include high availability and

security using NSX-T Data Center. The architect plans to provide a basic required components list In the

Logical Design.

Which solution should the architect recommend?

A. 2 NSX Managers, 2 virtual NSX Edges, one Tier-0 gateway, BGP configuration and a static route

B. 3 NSX Managers, 1 virtual NSX Edge, one Tier-0 gateway and a static route and OSPF

C. 1 NSX Manager, 2 virtual NSX Edges, two Tier-0 gateways In Active/Active, BGP configuration